top of page

Work has begun on drainage and septic tank for phase 2

Work has begun on the drainage to complete phase 2. Work on the septic tank has also begun and with these completed we will be looking to equip and open phase 2 of Herona Hospital


Featured Posts
Recent Posts
Archive
Search By Tags
No tags yet.
Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square
bottom of page